Pilot project #2

SPECIFICATIONS

  • Exterior Slab on Grade:
  • 3 loads – 24 m3
  • Placed by a pump
  • Finished by experienced finishers

RESULTS - Field Performance Assessment

  • Finished very well
  • Normal expected bleeding
  • No blistering or lifting of the surface
  • Exposed to winter – no surface deterioration to date
Cylinder #Date Tested Density kg/m3SpecifiedMPA1 DayMPA3 DayMPA7 DayMPA28 DayMPA56 DayMPA
A Oct 8 2020238432  38.4  
BOct 29 2020240132   47.5 
COct 29 2020239732   49.1 
D        
E