Pilot project #1

SPECIFICATIONS

  • Footing:  7.5 m3, placed with 50′ conveyor
  • Wall:  32 m3, placed with pump
  • Experienced residential builders

RESULTS - Field Performance Assessment

  • Pumped and placed very well
  • Did not shrink after floating
  • Balanced well
"The co2 infused concrete [mixed by Tri-City and ICT] was a really nice consistency. It poured well and the cream came nicely to the top.”   
Steve Duimering
Crew Chief